Engineering Design & Testing

Large Loss

Case Studies

Learn more about ED&T’s capabilities from our case studies.

» View Case Studies

Search Engine[er] ®

Welcome to Search Engine[er]®, your access to over 900 years of engineering experience.

» Find an Engineer

Claim Review and Analysis

Water Damage to Electrical Equipment

A 2" water sprinkler fitting opened on the eighth floor of a hospital tower, causing water to cascade down stairwells, elevator shafts and floor penetrations. The electrical system of the tower was completely rebuilt, and damage was claimed to non-tower locations as well. Determining what parts of the electrical repair were related to the incident involved a variety of tasks, including damage assessment, testing, reconstruction monitoring, project documents review, and materials and labor charge evaluation.

» View More Case Studies